Interior renovation of apartment 2A on the second floor as indicated on plans to add anew bedroom and a new bathroom with new interior partitions and new plumbing fixtures. No chan…
Install new plumbing fixtures as per plan. There is no change of use, egress, or occupancy filed under this plan.
Provide new sprinklers for alterated commercial space as per plans filed herewith. no change in use, egress, or occupancy. filed in conjunction with altco# m01330260, plumbing# m01…
Sprinkler changes on the 1st floor as indicated on drawings.
Plumbing changes on the 1st floor as indicated on drawings.
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy,
Alteration of the existing sprinkler system on 10th floor as per new architectural layout
Install new sprinkler heads for office space only, as per plan. Use existing standpipe riser as water source.
Replace @ 10th Floor: 3 lavatories, 3 toilets, 3 tubs, Relocate @ 10th Floor: 1diswasher, 1 washer/dryer, 1 sink, Install new @10th Floor: 1 Lavatory,1 toilet, 1 shower
Provide new plumbing fixtures for alterated commercial space as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing modifications on floors Cel, 01, MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Sprinkler modifications on floors SC1, Cel, 01, MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Plumbing work related to the interior renovation of apartment 9g on the 9th floor. no change to use, egress, or occupancy.