Alteration of the existing sprinkler system on 10th floor as per new architectural layout
Install new sprinkler heads for office space only, as per plan. Use existing standpipe riser as water source.
Install new sprinkler heads for office space only, as per plan. Use existing standpipe riser as water source.
Replace @ 10th Floor: 3 lavatories, 3 toilets, 3 tubs, Relocate @ 10th Floor: 1diswasher, 1 washer/dryer, 1 sink, Install new @10th Floor: 1 Lavatory,1 toilet, 1 shower
Replace @ 10th Floor: 3 lavatories, 3 toilets, 3 tubs, Relocate @ 10th Floor: 1diswasher, 1 washer/dryer, 1 sink, Install new @10th Floor: 1 Lavatory,1 toilet, 1 shower
Provide new plumbing fixtures for alterated commercial space as per plans filed herewith. no change in use, egress, or occupancy.
Provide new plumbing fixtures for alterated commercial space as per plans filed herewith. no change in use, egress, or occupancy.
Sprinkler modifications on floors SC1, Cel, 01, MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Plumbing modifications on floors Cel, 01, MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Plumbing modifications on floors Cel, 01, MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Sprinkler modifications on floors SC1, Cel, 01, MZ1 as per plans filed herewith. No changes in use, egress or occupancy.
Plumbing work related to the interior renovation of apartment 9g on the 9th floor. no change to use, egress, or occupancy.
Plumbing work related to the interior renovation of apartment 9g on the 9th floor. no change to use, egress, or occupancy.
modification of existing sprinkler systems. no change in use to egress or exits under this appliactaion.
Sprinkler work filed in conjunction with ALTCO. Application filed to supersede B01051703-S3
Sprinkler work filed in conjunction with ALTCO. Application filed to supersede B01051703-S3
Sprinkler work filed to modify existing wet system distribution to align with architectural floor and ceiling plans
Plumbing work related to ALTCO for white boxing 1st and 2nd floor. Application filed to supersede B01051703-S2.
Mechanical work filed for tenant fit out at 2nd floor.
Plumbing work related to ALTCO for white boxing 1st and 2nd floor. Application filed to supersede B01051703-S2.