New construction, addition, GFA change - For the erection of an attached structure with roof deck and roof deck access structure. Size and location as shown in plan.
New construction, addition, GFA change - FOR THE ERECTION OF AN ATTACHED STRUCTURE TO INCLUDE A ROOF DECK, ROOF DECK ACCESS STRUCTURE, AND 2ND FLOOR DECK IN THE REAR. SIZE AND LOCATION AS SHOWN IN PLA...
New construction, addition, GFA change - FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE ABOVE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLANS.
New construction, addition, GFA change - FOR THE ERECTION OF AN ATTACHED STRUCTURE. SIZE AND LOCATION AS SHOWN ON PLANS.
Addition and/or Alteration - Addition second story above the existing first floor used as single family dwelling. details as shown on the plan.
New Construction - FOR THE ERECTION OF AN ATTACHED 3-STORY STRUCTURE WITH ROOF ACCESS STRUCTURE FOR ACCESS TO AN OCCUPIABLE ROOF DECK. STRUCTURE FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. THE BUILDING...
New Construction - FOR THE NEW CONSTRUCTION OF A THREE (3) STORY ATTACHED BUILDING OF TYPE VA CONSTRUCTION WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE FOR THE USE OF BUSINESS OCCUPANCY AT THE FIRS...
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-004457
Addition and/or Alterations - Mechanical / Fuel Gas Permit for combo RP-2026-001852 EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and War...
New Construction - FOR NEW CONSTRUCTION OF A THREE (3) STORY WOOD-FRAME ATTACHED STRUCTURE ON REINFORCED CONCRETE FOOTINGS/FOUNDATIONS WITH A ROOF DECK. FOR USE AS A SINGLE-FAMILY DWELLING THROUGHOUT....
New Construction - FOR THE CONSTRUCTION OF AN ATTACHED STRUCTURE WITH CELLAR AND ROOF DECK ACCESSED BY A ROOF DECK ACCESS STRUCTURE. FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING. AS PER APPROVED PLANS....
Addition and/or Alteration - OWNER TO OPEN WALLS AS NEEDED TO CONFIRM ALL EXISTING WORK IS COMPLIANT WITH EZ PERMIT. NO WORK IN THE BASEMENT. EZ PERMIT STANDARDS ALTERATIONS- For alterations to an Exi...
New construction, addition, GFA change - **Amendment 3/27/2026 for the erection of a rear deck. Size and location as shown in plans.** For the erection of an attached structure with a roof deck and ac...
New Construction - Mechanical / Fuel Gas Permit for combo RP-2024-012677
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-011566
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-011464
New Construction - Mechanical / Fuel Gas Permit for combo RP-2025-012427
DigPermit aggregates public building permit data from city and county government portals. We don't issue permits. All data links to its original public source.
hello@digpermit.com