L-4 CARDIOLOGY Phase 4 : PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 4, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZO…
Install new drain, and relocate sprinkler heads and piping a per plans filed herewith as necessary to accommodate new medical equipment installation in the CT room on partial 7th f…
Install new drain, and relocate sprinkler heads and piping a per plans filed herewith as necessary to accommodate new medical equipment installation in the CT room on partial 7th f…
L-4 CARDIOLOGY Phase 3: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZON…
L-4 CARDIOLOGY Phase 3: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZON…
L4 CARDIOLOGY Phase 2: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 2, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONI…
L4 CARDIOLOGY Phase 2: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 2, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONI…
Provide new 2 domestic water distribution including ductile saddle on existing 6 dia. booster pump intake; provide new 2 double check valve for irrigation and 3/4double check valve…
Provide new 2 domestic water distribution including ductile saddle on existing 6 dia. booster pump intake; provide new 2 double check valve for irrigation and 3/4double check valve…
GP CT Simulator: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CT SIMULATOR FIT OUT, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRE…
GP CT Simulator: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE CT SIMULATOR FIT OUT, GREENBERG PAVILION, IN THE EXISTING HOSPITAL BUILDING. NO CHANGE TO ZONING, USE, EGRE…
Gp2 endo update: plumbing modifications to accommodate the endo update, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occupancy.
Gp2 endo update: plumbing modifications to accommodate the endo update, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occupancy.
Plumbing and sprinkler modification including RENOVATION OF AN EXISTING SPACE TO A NEW EQUIPMENTREPAIR ROOM WITH NEW SINK AND EYE WASH STATION
Plumbing and sprinkler modification including RENOVATION OF AN EXISTING SPACE TO A NEW EQUIPMENTREPAIR ROOM WITH NEW SINK AND EYE WASH STATION
Alteration to existing plumbing systems. No change in use, egress, or occupancy.
Alteration to existing plumbing systems. No change in use, egress, or occupancy.
replacement of 2 fire service rpz devices and 2 domestic service rpz devices in the same location in the existing hospital. (2) RPZ on domestic water services-WATTS 957, (2) DCDA o…
replacement of 2 fire service rpz devices and 2 domestic service rpz devices in the same location in the existing hospital. (2) RPZ on domestic water services-WATTS 957, (2) DCDA o…
Executive offices. modify existing sprinkler system in conjunction with building alteration.