Sprinkler and Standpipe work as per plans filed.
Plumbing work as per plans filed.
Installation of temporary standpipe system filed in conjunction with New Building B00923376-I1.
Temporary standpipe work as per plans filed
Installation of sprinkler and standpipe systems in conjunction with construction of new building.
Installation of temporary dry standpipe system during construction as per plans filed
Installation of plumbing fixtures and piping in conjunction with construction of New Building.
Plumbing filing as per plans filed