File to address full vacate order#258966 and ECB Violation #39128112K & #39128111Z. Proposed plumbing work and restore back to legal 3 family building as per plan. No change in use…
To remove illegal kitchen and 3-pc bathroom on cellar; renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 3-pc bathroo…
Plumbing work for the existing two-family house at cellar. no change of use, egress or occupancy.
Install new plumbing fxitures at cellar 1st 2nd and 3rd floor. general construction work was filed under job#b01380588-i1.
install plumbing fixtures in cellar, 1st and 2nd fl filed in conj with altco. no change in use, occupancy or egress
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar…
Install new plumbing fixtures at cellar 1st 2nd floor. general construction work was filed under dobnow job#b01374686-i1.
New plumbing fixture per plan for existing commercial space. Alteration on existing sprinkler system. No change in use, occupancy or egress.
Interior renovation of take-out on the first floor. installation of new kitchen prep sinks and plumbing fixtures. no change in use, egress and occupancy.
Renovation of existing office space. installation of new kitchen prep sinks. install plumbing fixtures. no change in use, egress and occupancy.
To cap/remove restaurant plumbing fixtures and replace fixtures. filed in conjunction w/ gc alt #q01333245-i1. no change of use, egress or occupancy.
Plumbing
Subsequent filing for plumbing work.
Subsequent filing for sprinkler work.
Cap and remove existing boiler, kitchen fixtures and bathroom fixtures on 1st floor and cellar. install new hot water heater, kitchen fixtures and bathroom fixtures on 1st, 2nd flo…
Subsequent filing for plumbing work. install bathroom, kitchen,and boiler room. no change in use, egress, or occupancy.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and replace bathroom fixtures; new 3-pc bathroom,washer, dryer, boiler and hot water heater in…
Installation of plumbing fixtures as per the plans filed herewith. no change in use, occupancy or egress.