Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Installation of temporary shoring and loose material removal as per plans submitted herewith. there is no change in use, egress or occupancy.
Exterior renovations consisting of repointing, brick replacement, sound testing, window sill replacement and crack repairs as per plans filed herewith. no change to use, egress or…
Installation of system beam as per plans. needle beam shall comply with the chapter #33 of the code. no changes in use egress or occupancy under this application.
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Part 2 proposed facade restoration at exposures 2, 3 and 4. includes masonry repairs, lintel replacement and other exterior work as per plans. no change in use, egress or occupancy…
Filed herewith to repair and replace the roofing system at 3rd floor penthoutse and roof. no change to use, egress or occupancy.
repair parapet wall and other masonry
Proposed exterior facade restoration and garage reapirs as per plans filed herewith. no change in use, egress or occupancy.
Ordinary facades repairs on the north, south, east and west elevations as per plans herewith filed.