Facade repair which includes re- pointing, window sill brownstone repair and brownstone repair as per plans @ exposure 1. sidewalk shed filed under a separate application.
Installation of medium duty pipe scaffold
Installation of temporary pipe scaffold for exterior repairs as per drawings. scaffold shall comply with ch #33 of the 2022 nyc building code. no change in use, occupancy or egress…
Replace the existing brick wall with new cmu wall at property line as per plan.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc build…
1. replace the parapet wall approximately=40 lf2. repair crack brick at exist. chimney#1 & 2 = 80 pcs3. re-pointing masonry joint at exist. chimney#1 & 2 = 760 sf
Facade repair which includes brick replacement and minor re-pointing as per plans. sidewalk shed shall be filed under separate application. no change in use occupancy or egress und…
Alteration filing to rehabilitation and repair facade components of an existing building