Herewith filing for interior renovation of Lobby and removal of roof system and installation of new and other work as per the drawings. No change in use, egress or occupancy.
Remove and replace the stage access stair and the platform for the wheels chair space. Removing the exterior ramp to replace it with an ADA accessible ramp.
Accessibility of existing building
Installation of pipe scaffold for ps 131q at 170-45 84 avenue, queens in conjunction with alt# 421902338, q01101060, q01101064, q01103002 as indicated on plans. there will be no ch…
Installation of temporary construction shoring for excavation as indicated on plans.there will be no change in the use, egress, or occupancy under this application.
Installation of temporary construction fence for ps 131q at 170-45 84 avenue, queens in conjunction with alt# 421902338, q01101064, q01101069, q01103002 as indicated on plans. ther…
Construction of new drainage system.
new shoring drawings for the detention tank which is filed with BCC is filled correctly in conjunction with our main job number Q00956028