Interior renovation of existing apartment (duplex 11) as per plans filed herewith. no change in use, egress or occupancy.
Temporary shoring of the 20th-floor slab.
General construction associated with the vertical extension and renovation of the building as per plans filed herewith
Structural work as per plans to include new doorway opening at second framing level of rear facade and installation of new rear moment frame. no change in use, egress or occupancy.
Interior renovation of existing single family dwelling on the basement and 001 through 004 floor. General Construction. Replace and install non load bearing partitions and interior…
Interior and exterior renovations consisting of reinforcement of existing floor framing, installation of new floor framing at a different elevation, reconfiguration of masonry wall…
Temporary shoring and bracing at rear wall at each floor level
Interior and exterior renovations as per plans filed herewith, no change in use, egress or occupancy.
Mechanical work as per plans.
Mechanical work as per plans filed herewith.
Removal & installation of duffusers & associated ductwork, piping & accessories. instllation of fan coil units. all exisitng mechanical equipment, ductwork, piping & accessories to…
Interior renovation of the building structure including addition of a new stair.
Interior renovation of apt. 55a with minor demolition. remove & relocate non load bearing partitions & ceilings per plans. no change in egress, occupancy or use is involved under t…
Mechanical work associated with renovation and vertical enlargement of building as per plans filed herewith. No change to occupancy, use or egress.