NYC DEV HUB: Support of excavation work in conjunction with new building construction.
Replacement in kind of cooling tower and associated condenser water pumps and piping
NYC DEV HUB Consultation 3/7/2025: Sub-slab depressurization work in conjunction with new building construction.
No change in egress, occupancy, or use. Reinforcement of the underside of the 2nd floor slab. Installation of new 2nd floor ceilings and partitions. Replacement of the 3rd floor ro…
Work includes new concrete infill & patching at slabs and pits, new reinforcement of structural steel framing to support new mechanical equipment, new penetrations through existing…
Gp4w: modification to interior partitions and finishes to accommodate the nurse stations and corridor upgrades, greenberg pavilion, in the existing hospital building. no change to…
Gp4w: hvac modifcations to accommodate the nurse stations and corridor upgrades, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occupanc…
NYC DEV HUB: Foundation work in conjunction with new building construction.
Proposed work consists of structural alterations as shown on the approved drawings. All work shall comply with the 2022 NYC Building Code, AC 28-104.7 (Box Office/Flatbush Entry/Lo…
Removal and installation of interior partitions and finishes as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
Phased filing per HUB consultation 02/10/26 with Rami Bitar. Selective demolition and removal of existing escalators, fire shutters, smore baffles, interior partitions, fixtures, f…
Mechanical work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
Phased filing per HUB consultation 02/10/2026 with Rami Bitar. Application filed for structural framing on FL 6.
Mechanical Work for theater fit-out in conjunction with NB # M00599495. Review to be done under 2014 code.
Fit out of theater space in conjunction with NB # M00599495. Review to be done under 2014 code.
Structural work for theater fit-out in conjunction with NB # M00599495. Review to be done under 2014 code.
Application filed for exterior renovation of existing facade and storefront as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for exterior renovation with structural and footing additions/modifications in the cellar & on the 1st, 2nd, & 3rd floors as per plans filed herewith. no change i…
GC for Windows, skylight, flooring, doors removals. DEV HUB CONSULTATION COMPLETED 1/22/24- Rami Bitar
ST/FO for all structural foundation removals and new installation