No public phone or license recorded on recent permits for this contractor. Permit history is listed below.
Interior demolition of unit #B-4G, Existing Bathroom-40 SF OF TOTAL
CFA / H Demolition of an existing interior elevator, interior walls, and flooring. Demolish bathroom walls, flooring, and fixtures.
CFA / H The scope of work shall include the replacement of a residential elevator, including a new shaft to be built within the existing shaft. Work shall be limited to the interio…