1A Doors: Modification of interior ceilings and finishes to accommodate replacement of existing doors, vestibules and windows as per plans. no change to use, egress or occupancy.
2A Doors: Modification of interior ceilings and finishes to accommodate replacement of existing doors, vestibules and windows as per plans. No change to use, egress or occupancy.
Installation of temporary construction shoring for excavation for hs 285m at 22 east 128 street, manhattan as indicated on plans. there will be no change in the use, egress, or occ…
Installation of temporary construction shoring for excavation for hs 285m at 22 east 128 street, manhattan as indicated on plans. there will be no change in the use, egress, or occ…
Removal/install of non-load bearing partitions, fixtures and finishes in cel, 001-003 and rof for existing nycct environmental (e) bldg. no change in use, egress or occupancy.
Removal/install of non-load bearing partitions, fixtures and finishes in cel, 001-003 and rof for existing nycct environmental (e) bldg. no change in use, egress or occupancy.