Interior renovation as per plans filed herewith.
Structural work as shown on plans filed herewith. No change to use, egress or occupancy.
The gap - removal and installation of interior partitions and finishes. no change in use, egress, or occupancy.
Removal of mechanical ducts and associated piping.
Structural work to remove existing elevator & escalator walls between the cellar to the 1st floor and infill elevator & escalator openings in the 1st floor slab.
The proposed tenant first floor improvement work consists of new partitions, finish ceiling and flooring within a fully-demised / fire-rated mercantile tenant space. no change in u…
Structural work reinforcement of existing beam on 2nfl to increase capacity, no change in use, occupancy, or egress proposed work is 40sf.
Remove and install ductwork associated with new tenant layout for Alo per plans filed herewith. no change in egress, use or occupancy.
Interior build out in existing commercial space for new tenant Alo. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewit…
Structural work in commercial space for new tenant build out for Alo per plans filed herewith. Work in include trellis support. No change in egress, use or occupancy.
Replacement of existing exterior doors with same in same location as per plans filed herewith. No change in egress, use or occupancy.