Interior remodel / finish out of second floor and elevator pit.
Interior remodel existing admin office
Phase 1 Conversion of an existing pre-engineered metal building into a temporary Nissan showroom with a display area customer lounges restrooms and sa
Phase 2 conversion of an existing pre-engineered metal building into a temporary Nissan showroom with a display area customer lounges and sales desk.
ePlan: Commercial Expedited Review - Interior Remodel of Existing Business Office (23203 SF)
Partial Renovation of Existing Interior Space for Suite 900
7 DAY renovation of existing interior space
The space is 3529 sqft and it is currently an open finished out unused room. Within these 2 open offices. With these 2 open offices there will be a smaller offices. There will be a…