Filing for Structural/Foundation work for Reach 5 - Construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project. No change to use, egress or…
Filing Support of Excavation work for Reach 5 - Support of Excavation filing for construction of a flood barrier system and two bridging structures for the BPCA North/West Battery…
Filing Mechanical work for Reach 5. Mechanical installations inside underground bridging structures for the BPCA North/West Battery Park City Resiliency project. No heating and coo…
Reach 5 - filing for Earthwork/ Construction of a flood barrier system and two bridging structures for the BPCA North/West Battery Park City Resiliency project. No change of use, o…
Reach 7-new flood wall constr. for nwbpcr proj. scope involves excavation, grading, landscaping soil improvement. adding & compacting fill to stabilize site w/ erosion cont. stabil…
Reach 7 - Temporary relocation of the HVAC system. Once construction of the proposed area is done, HVAC will be restored back to its original location. No change to use, egress or…
Reach 7- proposed flood barrier sys. includes i-walls w/ cap/wall, micropile-founded t-/l-walls, closure gates (roller @ 2nd pl, swing @ 3rd, flip-up @ sea), slide-up gates, gravit…
Filing SOE work for Reach 7 - Filing for the construction of a flood barrier system for the BPCA North/West Battery Park City Resiliency project including support of excavation for…