Interior renovation of the 32nd & 33rd marketing floor/31st & 32nd construction floor. removal &installation of walls, doors, floor finishes, and ceilings as per plan. the area of…
Mechanical work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.
Construction work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.
General construction alterations at the 1st floor for proposed interior floor level modification; related work as per plans. No proposed change to building use, egress, or occupanc…
Mechanical work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.
Structural alterations at the 1st floor for proposed interior floor level modification including built-up concrete slab and relocated stair & ramp; related work as per plans. No pr…
5th floor demo-- pre-tenant interior non-structural demolition inclusive of partitions removals as per plans filed. no change to use, egress, or occupancy.
5th floor demo-- pre-tenant interior non-structural demolition inclusive of partitions removals as per plans filed. no change to use, egress, or occupancy.
Erection of construction fences at certain locations along first floor commercial storefront. no change to use, egress or occupancy.
Erection of construction fences at certain locations along first floor commercial storefront. no change to use, egress or occupancy.
Installation of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes, Pantry, ADA Restroom and Renovate Existing Men's & Women's Restrooms on 32nd Floor. No Change…
Structural changes for slab infill on the 24th floor construction (25th floor marketing) as indicated on drawings.
Install Air Conditioning & Transfer Air Ducts & Grilles, Volume Dampers, Supply Air Diffusers, Return Air Grilles, Exhaust Fans & Ducts & Replace Insulation on Existing H.P. Duct o…
Install Air Conditioning & Transfer Air Ducts & Grilles, Volume Dampers, Supply Air Diffusers, Return Air Grilles, Exhaust Fans & Ducts & Replace Insulation on Existing H.P. Duct o…
Interior mechanical demolition on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construction (25th floor marketing) as indicated on drawings.
Interior demolition of non load bearing partitions on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construction (25th floor marketing) as indicated…
Interior demolition of non load bearing partitions on the 3rd floor, 23rd floor construction (24th floor marketing) and 24th floor construction (25th floor marketing) as indicated…