Mechanical modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
Architectural modifications taking place on the 12th and 13th floors as per plans filed herewith. No change in use, egress or occupancy.
Architectural modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
Construction work on the 41st floor construction (42nd floor marketing) as indicated on drawings.
Demo Supplemental A/C Units&Piping, Replace Some Ductwork, Supply Air Diffusers&Return Air Grilles on 14&15 FL, Install A/C Unit, Piping&Ducts for IT Rm on 14 FL, Exhaust Fans&Duct…
Demolition and Construction of Partitions, Doors, Suspended Ceiling, Millwork, Floor & Wall Finishes on the 14th & 15th Floors. No Change to Occupancy, Use or Egress is Proposed
Construction work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.
Mechanical systems work on the 32nd & 33rd marketing floor (31st & 32nd construction floor) as per plans filed. no change to use, egress or occupancy.
Mechanical work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.
Interior renovation of the 32nd & 33rd marketing floor/31st & 32nd construction floor. removal &installation of walls, doors, floor finishes, and ceilings as per plan. the area of…
Construction work on the 31st floor construction (32nd floor marketing) core bathrooms as indicated on drawings.
Structural alterations at the 1st floor for proposed interior floor level modification including built-up concrete slab and relocated stair & ramp; related work as per plans. No pr…
General construction alterations at the 1st floor for proposed interior floor level modification; related work as per plans. No proposed change to building use, egress, or occupanc…
Mechanical work on the 24th floor construction (25th floor marketing) core bathrooms as indicated on drawings.
5th floor demo-- pre-tenant interior non-structural demolition inclusive of partitions removals as per plans filed. no change to use, egress, or occupancy.
Erection of construction fences at certain locations along first floor commercial storefront. no change to use, egress or occupancy.