Emergency work of removal of rear exterior wall
Interior demolition of partitions as per plans no change in use, egress or occupancy.
Filing for the removal of the interior partition work, finishes, the package conveyor system. Repair and infill the area of the conveyor system. No change in use, egress or occupan…
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Interior soft demolition, no change to use, occupancy or egress under this application
Proposed construction fence. no change to use, egress or occupancy under this application.
full demolition of four story structure using had held, and mechanical to load out on 1st floor
Full demolition to a five story building
chute will be built out, to assist with loading out of debris from floor to floor. Bobcat will assist with loading out debris from 1st floor
installation of construction fence to protect site
installation of construction fence to protect site, during full demolition
Debris chute will be installed/built to lower debris from floor to floor. Mechanical means will assist with demolition from exterior and placed on grade.
Installation of temporary plywood fence as per plans during construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.