Minor interior demolition. Removal and disposal of interior partitions, fixtures, suspended ceilings, floor and wall finishes, selective piping on the 1st Floor and Mezzanine Level…
Interior alterations to existing stair wall area at cellar and 1st floor, including stair wall upgrade and related general construction work. No change in use, egress, or occupancy…
Mechanical modifications to include HVAC replacement and replacement of associated ductwork. No change in use, occupancy, or egress.
Alterations to mechanical system on 43rd floor as per plans. No change to use. egress or occupancy.
Modifications to the existing HVAC System: Install (1) new FSD and tie into existing ductwork. Existing mechanical system throughout space to remain as per plans (Ted's Demo) No ch…
Demolition in 43rd floor to include the removal of interior non-load bearing partitions, doors, and finishes as per plans filed herewith. no change in use, egress or occupancy.
Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 20th floor (SNA Displays) as per plans. No change to use, egress or occ…
Modification to the existing mechanical system on the 20th floor (SNA Displays) as per plans. No change to use, egress or occupancy