Structural work consists in creating new mechanical louvre wall opening and floor reinforcement for associated mechanical equipment as per plans filed herewith. no change in use, e…
General construction for 12th floor apartment renovations & window replacement, penthouse mechanical room, & dep required acm abatement as per plans filed herewith. no change in us…
Mechanical work associated with 12th floor apartment renovations & accessory mechanical room on penthouse level as per plans filed herewith. no change in use, egress or occupancy.
Interior renovations of non-load bearing partitions, replacements of interior finishes at ceiling, wall and floor surfaces, and installation of new LED lighting. No change in use,…
Replacement of existing mechanical units along with associated piping and ductwork. No change in use, egress or occupancy.
Interior renovations of non-load bearing partitions, replacements of interior finishes at ceiling, wall and floor surfaces, and installation of new LED lighting. No change in use,…
Replacement of existing mechanical units along with associated piping and ductwork. No change in use, egress or occupancy.
Interior 12th floor structural work consisting of structural floor & ceiling slab repairs as per plans filed herewith. no change in use, egress or occupancy.
Interior 12th floor structural work consisting of structural floor & ceiling slab repairs as per plans filed herewith. no change in use, egress or occupancy.
Window enclosures required by dep for window replacement & acm abatement under associated gc permit# m01234604 as per plans filed herewith. no change in use, egress or occupancy.
Window enclosures required by dep for window replacement & acm abatement under associated gc permit# m01234604 as per plans filed herewith. no change in use, egress or occupancy.