Soe work in conjunction with alt-co #m00972936.
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m009729…
Remove and install hvac equipment in conjuncton with alt-co #m00972936. work on floors 1-3, rof.
Filing to amend existing C of O to add mezzanine level as per plans submitted.
Filing to amend existing C of O to add mezzanine level as per plans submitted.
The renovation project joins two existing warehouses located on one lot, and owned by one owner. the existing warehouses are each one story, constructed of steel and masonry. no ad…
The renovation project joins two existing warehouses located on one lot, and owned by one owner. the existing warehouses are each one story, constructed of steel and masonry. no ad…