Suspended scaffold and roof swing roof in order to perform exterior facade repairs. Facade inspections to be performed. Sidewalk shed filed under separate application. No change in…
Filing for masonry facade and roof replacement work. no change to use, egress or occupancy
Suspended scaffold and roof swing roof in order to perform exterior facade repairs. Facade inspections to be performed. Sidewalk shed filed under separate application. No change in…
Structural work in conjunction with Roof replacement and Asbestos abatement
Structural work in conjunction with Roof replacement and Asbestos abatement
Asbestos removal on Roof level and replacement of roof
Asbestos removal on Roof level and replacement of roof
PAA filed to add material hoist and locations (Counter weight system)
PAA filed to add material hoist and locations (Counter weight system)
General Construction plans filed herewith to show new addition for garage exit door from left side. No change to use, egress, or occupancy.
General Construction plans filed herewith to show new addition for garage exit door from left side. No change to use, egress, or occupancy.
Architectural alterations at 1st, 2nd floors and roof as indicated on drawings.
Architectural alterations at 1st, 2nd floors and roof as indicated on drawings.