1 Terminal Dr
Nashville · TN · 37214
Nashville · TN · 37214
The project is a 700 SF finish upgrade to the 3rd floor American Airlines Admirals Lounge located on the 3rd floor Concourse C at BNA. The upgrades include replacing existing millwork, adding a plumbing connection, and adding eletrical outlets, as well as replacing flooring material , patching walls and ceilings where finishes have been removed. There is no change to life safety, egress or occupancy.
4 other permits at 1 Terminal Dr. Electrical, plumbing and HVAC on one property often share a GC, so follow the paper trail.
Level 2 alteration. No work involved with the existing building envelope. Scope of work includes removal of interior non-bearing walls, installation of new interior non-bearing wal…
Interior renovation of an existing residential property including selective demolition, minor framing modifications, updated finishes, and fixture replacements. Work includes kitch…