100 Joliet St SW, Washington, Dc 20032
Washington · DC
Washington · DC
Existing asphalt pavement to be milled and overlayed. Asphalt pavement to be very slightly widened and elongated to provide two full size basketball courts as an add alternate. Install padding to light poles in the base scope and relocate them as an add alternate. New basketball hoops and a new sign explaining the rules in english and spanish shall be installed. Two 9.5'X7' concrete pads for new bleachers shall be provided.
Interior alterations and repair for the 5th floor amenity level 2 interior alteration to public areas on the 5th floor of the homer building to replace finishes, lighting, and add…
Interior renovation of the kitchen located in the basement. A below grade areaway will be constructed in the courtyard to provide space for a new outdoor walk-in cooler. The existi…