Electrical Permit — 10000 W OHARE AIRPORT
Electrical
$50,000
Grand-Kahn, Llc
Realterm
Cook County
Work Description
Line voltage electrical work. add 11 circuits to existing 800 amp service disconnecting means. receptacle outlets: 1 . lighting outlets: 40. specific location: warehouse: 514 n express center dr.
Other permits at this address
7 other permits at 10000 W OHARE AIRPORT. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Electrical maintenance permit. occupancy: institutional. start date: 4/10/2026. end date: 5/10/2026. all work under this permit must be performed by employees of the listed electrical contractor. the...
Low voltage/communication electrical work. alter existing telephone. specific location: kiosks.
Self-cert 2019 cbrc: interior alterations to existing tsa breakroom and securtiy check lanes at o'hare airport terminal 1, including inew finishes, kitchenette, workstations and checkpoint equipment....
Self cert 2019 cbc - architectural renovation of existing office andairline lounge spaces into demised office spaces per plans(occupancy- b, type of construction - ib). project to includestructural in...
Electrical maintenance permit. occupancy: institutional. start date: 3/6/2026. end date: 4/5/2026. all work under this permit must be performed by employees of the listed electrical contractor. the el...
Terminal 3 - relocation/revision to four caissons
Electrical maintenance permit. occupancy: institutional. start date: 2/2/2026. end date: 3/4/2026. all work under this permit must be performed by employees of the listed electrical contractor. the el...
More Electrical permits in Chicago
Spr 2019 cbc: interior renovation to an exist. single-family frame/masonryresidence. repair exist. rear wood deck, upgrade to exist. mechanical,electrical and plumbing. (occupancy group r-5 type iiia...
Scope: nonstructural interior repair/replacement of drywall, electrical, plumbing and finishes due to fire damage. locations: 1 residential unit(s), 0 non-residential unit(s), throughout sfr
Self-cert 2019 cbrc: interior alterations in existing office building on the 27th floor, to exiting full floor office suite 2750, interior partitions, millwork, finishes, electrical mechanical and plu...
Scope: nonstructural interior replacement of electrical, plumbing and finishes. locations: 1 residential unit(s), 0 non-residential unit(s), 1st floor only
Line voltage electrical work. add 3 circuits to existing 100 amp service disconnecting means. receptacle outlets: 15 . lighting outlets: 28. specific location: basement.