Washington, DC
Washington · DC
Washington · DC
New interior alteration of the 2nd floor. the work consists of non structural demolition, and new general plumbing, electrical, and mechanical work. no structrual work is required. there is no change of use. total area of work: 4,908 usf.
The project is the renovation of a 2 story brick house with cellar, located along 9th street in northwest washington dc. the project includes new structural beams. it also includes…
Change of use from residential (R-2) to mixed-use (R-2 and B), incorporating a cafeteria located in the basement of the existing building. The work includes the installation of a n…