108 7th Ave S
Nashville · TN · 37203
Nashville · TN · 37203
Modifications to exterior entry paving and canopy at existing Nashville First Baptist Church facility. Areas of work are designated as Door 2 and Door 3. Work includes: • Removal of existing canopy and installation of a new canopy at Door 3. • Replacement of existing exterior stair and landing at Door 2. • Replacement of existing exterior stair and landing at Door 3. New work includes a stair and accessible ramp. • Additional lighting at exterior building wall and railings. • Minor modification to existing potable water piping as required to accommodate installation of new beam within vault below Door 3. No change to building exterior envelope or mechanical systems. No change to building interior amenities. POC: Cary Sweat 615.730.3137
Doing interior renovations to the property, adding a dormer on the second level in rear, adding one covered deck to rear 20x12. there will be no change to building footprint. Pleas…
FOOTPRINT TO REMAIN THE SAME Interior remodel with full upgrades including electrical mechanical and plumbing for existing three bed one bath single family residence. RS10 Zoning.…