Addition and/or Alteration - Install a new 400-amp electrical service with five (5) meter packs, including service conductors, meter sockets, main disconnecting means, and proper grounding and bonding. Install one (1) 100-amp subpanel for the house and four (4) 125-amp subpanels for each dwelling unit, including all required feeders, overcurrent protection, grounding, and terminations. Provide complete electrical distribution throughout the building, including installation of branch circuit wiring, lighting fixtures, switches, exit signs, emergency lighting, and receptacle outlets.
Install interconnected smoke and carbon monoxide alarms in accordance with the 2017 NEC. Furnish and install a fire alarm system in accordance with NFPA 72 (2016 edition) and per approved plans,