1275 K St NW, Washington, Dc 20005
Washington · DC
Washington · DC
Scope of work includes alterations to the 5th and 6th floors including selective interior and exterior demolition, interior construction includes new partitions, ceilings, and finishes. Mechanical, electrical, plumbing and fire lifesafety scope indicated on the drawings. Exterior work includes new curtainwall, waterproofing, pavers, and guardrails for new exterior terrace space. Spec suites 500, 525, 550, and 575 and level 6 whitebox suites. Existing means of egress shall be maintained throughout the duration of the work. The interior renovation includes new partitions, doors, hardware, ceilings, lighting, and finishes.
Removal of existing interior stairway connecting the kitchen (main level) to the second floor. Removal of existing partition walls in Bedroom #1 on the second floor to allow expan…
Limited demolition and tenant improvement /alterations to interior build-out of partitions, ceilings, finishes, etc, and installation of furniture in existing vacant space. no stru…