129 S Salford St
Philadelphia · PA · 19139
Philadelphia · PA · 19139
New construction - for the erection of an attached three-story structure for use as a two-family household living. building to be sprinklered in accordance with nfpa 13d. all work to be done per approved plans. separate permits to be obtained for all other work. if field conditions vary contact design engineer prior to the start of any work. **a covered walkway or sidewalk closure shall be required within 10 feet (1/4th of height of building) of the building facade in accordance with section 3306 of the 2018 ibc. separate building and/or streets department permit required prior to the start of any work. ** blower door testing shall be performed in accordance with astm e 779 or astm e 1827 by an approved third-party agency **no excavation greater than 60 inches with this permit **
1 other permit at 129 S Salford St. Electrical, plumbing and HVAC on one property often share a GC, so follow the paper trail.
New construction, addition, gfa change - for the erection of an attached structure to include a roof deck and roof deck access structure. size and location as shown in plans.
New construction, addition, gfa change - for the erection of a vertical addition on an existing attached structure. size and location as shown in plans.