New Construction - Install a new 600-amp electrical service with meter packs, including service conductors, meter sockets, main disconnecting means, and proper grounding and bonding. Install one (1) 150-amp subpanel for the house, one (1) 200-amp subpanel for the commercial space, and one (1) 200-amp subpanel for each of the four (4) dwelling units, including all required feeders, overcurrent protection, grounding, and terminations. Provide complete electrical distribution throughout the building, including installation of wiring, lighting fixtures, switches, lighting control systems, exit signs, emergency lighting, and receptacle outlets. Install branch circuits and electrical connections for the elevator and electric vehicle charger. Install interconnected smoke and carbon monoxide alarms as required. Furnish and install a fire alarm system, including all required control equipment, initiating devices, notification appliances, wiring, terminations, programming, and testing. All work shall be performed in accordance with the 2017 NEC, the 2016 NFPA 72 and per approved plans.