Washington, DC
Washington · DC
Washington · DC
(for campaign legal center) proposed work consisting of interior renovation and demolition to an existing building on part of the third floor-suite-300, include non-structural partition, finishes, lighting, mechanical, electrical and plumbing as per plans.
Selective non-load bearing walls demo, upgrades for the interior plumbing, electrical, and mechanical fixtures, and convert the use to a single-family with an ADU in the basement.