Washington, DC
Washington · DC
Washington · DC
Interior alteration and repair without structural modifications includes the following:1. basement: finish existing basement. replace existing bathroom framing and fixtures in kind. install insulation on perimeter walls.replace electrical panel heavy up (200amps) replace mechanical equipment install drywall on walls and ceilings. 2.first floor: replace kitchen cabinets and appliances. install new drywall on walls and ceilings. repair / reinforce existing subflooring. existing exterior deck to remain undisturbed.install perimeter walls insulation. 3. second floor: replace existing bathroom fixtures and plumbing in kind. install perimeter walls insulation. replace base drywall up to 2ft. replace attic mechanical unit. existing attic to remain unfinished. install r-49 roof insulation. existing roofing to remain.note: all exterior windows and doors to remain install new flooring, new paint all throughout.
Construction of a roof-mounted solar photovoltaic (PV) system with a capacity of 70.80 kWp DC and 50.00 kW AC, including associated racking, wiring, and electrical equipment, inter…
to install 9.24 KW DC on the roof of the building