Philadelphia, PA
Philadelphia · PA
Philadelphia · PA
Make safe permit for rp - in accordance with code bulletin pm-1801, a pa professional engineer is required to monitor repairs made under this permit. the engineer must submit a sealed statement to the department confirming that the structure is in sound condition at completion. make safe permit - for the repair of main roof and demolition of rear baay as per plan and engineer’s report to resolve case #cf-2022-067258. abutting sidewalk must be closed with fencing a minimum of 6’ in height. separate streets department permit required for sidewalk closure. a separate permit is required for any additional alterations that are not specifically addressed on case #cf-2020-000808 .
1 other permit at Philadelphia, PA. Electrical, plumbing and HVAC on one property often share a GC, so follow the paper trail.
Change of Use - Limited Lodging