Bronx, NY
Bronx · NY
Bronx · NY
Installation of a temporary overhead protection and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
5 other permits at Bronx, NY. Electrical, plumbing and HVAC on one property often share a GC, so follow the paper trail.
New pool dehumidifier unit on the roof to serve the swimming pool, a new 1000 mbh boiler, a new 700 cfm exhaust fan to serve the chlorine storage room and (four) new hot water pump…
It is proposed to file for plumbing work for the proposed new building as shown on the plans.
Installation of 300 psf sidewalk shed and roof protection as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th…