Washington, DC
Washington · DC
Washington · DC
Remove the existing main roof membrane and metal covering on the roof and replace with new Firestone glue TPO membrane. Lumber on the roof to be left as is. Replace all metal coping on one side. Add ice and water shield as needed. Add 3-inch insulation board. Replace the overhang roof slate with new composite slate. Replace the rear gutter.
HISTORIC This application is a revision to the previously approved permit SOL2504293. The revision includes the relocation of rooftop solar panels with no structural impact, as wel…