Renovation
$1,632,466
Premier Construction Inc
Karim H.
New York County
Limited to repair of existing exterior facade elements of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fisp). no changes to use, egress, or occupancy.
4 other permits at 158 West 144 Street. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Interior renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: direct replacement of finishes throughout, direct replacement of kitchen, bathroom, doors and windows. no c...
Interior renovation of 6-story nycha multiple dwelling as part of the nycha pact renovation: direct replacement of finishes throughout, direct replacement of kitchen, bathroom, doors and windows. no c...
Installation of heavy duty sidewalk shed with material storage (300 psf and 600 psf) during facade repair. no change in egress, use, or occupancy. shed to comply with 2014 nyc building code.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy.