Washington, DC
Washington · DC
Washington · DC
Interior work only, repair/replace the following: replace switch disconnects for elevator mainline power, fireproof openings and voids in elevator room and hoistways, replace machine room door with new fire rated door, frame, and code compliant hardware, upgrade the electrical equipment in elevator equipment spaces, upgrade lighting in elevator equipment spaces, new or modified pit access ladders, new stand-alone elevator supervisory control unit (ESCU) for elevator recall only, provide standby power to elevator equipment, provide emergency power to light fixtures in elevator spaces, provide new 9000 gph sump pump
HISTORIC This application is a revision to the previously approved permit SOL2504293. The revision includes the relocation of rooftop solar panels with no structural impact, as wel…