Electrical Permit — 166 Palm Av
Electrical
$22,000
Pavel Makeyeu
San Francisco County
Work Description
unit 4: bathroom renovation: new toilet installation with relocation of drain; fan installation with duct line on exterior wall; replacing wall and floor tile; new vanity installation; bathroom rewiring: adding a fan switch, new vanity light. exhaust terminate per cmc 502.2.1.
Pavel Makeyeu filed a electrical permit at 166 Palm Av with no contractor listed.
More Electrical permits in San Francisco
unit 311: remodel 1 bathroom like for like, new plumbing and electrical. toilet, vanity, sconces for the bathroom.
repair or replace sheetrock in e utility room with new 5/8 in type x gyp bd. repair and upgrade electrical service
unit #7: kitchen renovation in like kind. new shower valve & tile walls. upgrade electrical sub panel. add washer and dryer.
add a separation wall to divided (e) bedroom into 2 bedrooms to include (n) electrical outlets, 2 doors, and 3 windows in kind visible from street. vinyl windows.
prop h:revision to pa# 202512081211. tenant fit out of an existing business space. new interior partitions, finishes and fixtures. new electrical, lighting mechanical systems and controls. new plumbin...