Electrical
Not listed
Chris C.
San Diego County
Wireless Communication Facility (WCF)-Express-Building Construction:1765/Pentecost - MID-CITY: EASTERN AREA - SPECTRUM ACT - Building and electrical permit for Verizon to remove (6) antennas, install (13) antennas, (6) RRUs and (2) OVP on existing faux broadleaf tree. At ground level, install (2) OVP, (3) transceiver modules, (3) basebands, (3) trunk and jumper gland kits and (1) hybrid cable. RM-2-5
Chris C. filed a electrical permit at 1765 Pentecost Wy, San Diego, CA 92105 with no contractor listed.
1 other permit at 1765 Pentecost Wy, San Diego, CA 92105. Electrical, plumbing, and HVAC on the same property usually share a general contractor.