1900 Half St SW, Washington, Dc 20024
Washington · DC
Washington · DC
Work scope: the scope of work for these demolition drawings involves selective demolition of an existing building for a future interior renovation limited to ground level (p1) and first floor level (1). the extent of the demolition is
Removal of existing interior stairway connecting the kitchen (main level) to the second floor. Removal of existing partition walls in Bedroom #1 on the second floor to allow expan…
Limited demolition and tenant improvement /alterations to interior build-out of partitions, ceilings, finishes, etc, and installation of furniture in existing vacant space. no stru…