Addition and/or Alteration - Install a new 400-amp electrical service with five (5) meter packs, including service conductors, meter sockets with proper grounding and bonding.
Install one (1) 100-amp subpanel for the house, one (1) 100-amp subpanel for one dwelling unit, one (1) 125-amp subpanel for another dwelling unit, and one (1) 150-amp subpanel to serve the remaining two dwelling unit. Install branch circuit wiring, lighting fixtures, switches, exit signs, emergency lighting, and receptacle outlets. Install interconnected smoke and carbon monoxide alarms. Furnish and install a fire alarm system. All work to be perform according to the 2017 NEC, 2016 NFPA 72 and per approved plans.