ADU
$226,124
Mark I.
San Diego County
General-Standard-Building Construction:1983/Hanford - **Scope Change (03/19/2026)**LINDA VISTA: Combination building permit; For the proposed new detached two-story ADU to include 3 bedrooms and 2 bathrooms. For the new storage attached at the rear of the ADU with laundry room for use to the (e) SFR only. For the (n) proposed, freestanding wall, at the rear yard. RS-1-7 (VHFSZ).
Mark I. filed a adu permit at 1985 Hanford Dr, San Diego, CA with no contractor listed.
Non-DCE-Standard- Standalone:4271/J - SOUTHEASTERN SAN DIEGO: Right of way permit for proposed work to include new water service, new fire service and residential driveway for an existing SDU and 4 pr...
General-Standard-Building Construction:8021/Jamacha - SKYLINE-PARADISE HILLS: Combination building for a proposed (N) detached 1-story ADU and a (N) covered porch to an (E) 1-story SDU. (VHFSZ).