Roofing Permit — 200 PARK AVENUE
Roofing
$6,305,000
The Grenadier Corporation
Mark Landstrom
New York County
Work Description
Hereby filing roof repairs and terrace enhancement at the 10th Floor and 10th Floor Bulkhead as per Plans. No Change to use, egress, or occupancy.
Other permits at this address
10 other permits at 200 PARK AVENUE. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Filing herewith plumbing work as per plans.
Filing herewith plumbing work as per plans.
Hereby to remove fire hose cabinet as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby to remove fire hose cabinet as shown on plans filed herewith. No change to use, occupancy or egress.
Application for the installation of suspended scaffold filed herein. No change in use, egress, or occupancy.
Application for the installation of suspended scaffold filed herein. No change in use, egress, or occupancy.
Hereby filing roof repairs and terrace enhancement at the 10th Floor and 10th Floor Bulkhead as per Plans. No Change to use, egress, or occupancy.
Hereby filing to relocate and install sprinkler heads with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to relocate and install sprinkler heads with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing Relocation of existing standpipe piping and replacement of existing 3-way roof manifold as shown on plans filed herewith. No change to use, occupancy or egress.
More Roofing permits in Manhattan
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m00972936.
CONSTRUCTION OF NEW ACCESS STAIR, LOUVERED SCREEN AND RAILING ON ELEVATED STEEL PLATFORM ON UPPER AND LOWER LEVELS.NEW GRATING ON LOWER LEVEL OF TANK PLATFORM AND NEW GRATING ON UPPER LEVEL OF TANK PL...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary overhead protection per plan. no change in use, egress, or occupancy. the overhead protection at 110 greenwich st roofs/terrace. and in the courtyard east at 102 &110 & 108 &...
Modification to existing Verizon site. Replace 6 antennas, remove 3 antennas, install 3 antennas, replace 9 RRH units, remove RRH rack, and install 1 equipment cabinet on an existing platform on the r...