2208 49th St W
Minneapolis · MN
Minneapolis · MN
Cap existing supply and waste lines at the kitchen sink location (which stays in the same spot) - TBD: Run the water line to the fridge. Supply ice maker box. Valve off under sink. - Install new kitchen faucet, disposal, connect fridge water and DW
2 other permits at 2208 49th St W. Electrical, plumbing and HVAC on one property often share a GC — follow the paper trail.
Main floor kitchen remodel work in existing single family house. aaj (project dox plans). demolition work: - remove non-load bearing wall between kitchen and dining area as noted o…
Re water pipe, and DWV a 2 bath home. new water heater and stove location.