Other Permit — 23 EAST 9 STREET
Other
$46,000
Made Llc
Vanessa Chow
New York County
Work Description
Support of Excavation as shown on drawings.
Other permits at this address
10 other permits at 23 EAST 9 STREET. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Support of Excavation as shown on drawings.
Renovation and conversion of Multi-family to a single family home. Architectural/ Construction work only.
Renovation and conversion of Multi-family to a single family home. Architectural/ Construction work only.
install 22'-6 fence in from of the building
install 22'-6 fence in from of the building
In conjunction with renovation of townhouse, Minor foundation work, in the cellar and structural work from cellar to roof.
In conjunction with renovation of townhouse, Minor foundation work, in the cellar and structural work from cellar to roof.
(PHASE I) interior Demo/ renovation of existing 4 stories, plus cellar structure. Architectural/ construction work only.
temporary Construction / mock-up to show the proposed roof and rear yard change for landmarks approval. No new proposed construction architectural / Temporary construction work only. .
temporary Construction / mock-up to show the proposed roof and rear yard change for landmarks approval. No new proposed construction architectural / Temporary construction work only. .
More Other permits in Manhattan
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of sidewalk shed and supported scaffold as shown on drawings. no change in use, egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Replace bathroom Flooring, refinish existing wood flooring, new interior doors, remove partial non load bearing partition @ kitchen, New cabinets & millwork. No change in use, egress, or occupancy.
Installation of new tru-wall a/c wall unit. Requiring removal of brick exterior wall of the size of 27x16 for sleeve and installation of 5/8x8 flat steel lintel