Renovation
$225,000
Think Construction Llc
Andrew H.
New York County
Midtown-Times Square
General Construction
Initial Permit
Combine Apts. 10B&10C (per TPPN 3/97), removing and replacing wall,, ceiling and floor finishes, removing and adding non load bearing partitions, replacing kitchen cabinets and appliances. Sub Docs to be filed for MS & PL
5 other permits at 24 West 55 Street. Electrical, plumbing, and HVAC on the same property usually share a general contractor.
Herewith file plumbing plans to combine Apt. 10B and 10C, filed in conjunction with general construction. (sf for areas of plumbing work: kitchen 100 sf., pantry 55 sf., bathroom 52 sf, total 207 sf)
Herewith file plumbing plans to combine Apt. 10B and 10C, filed in conjunction with general construction. (sf for areas of plumbing work: kitchen 100 sf., pantry 55 sf., bathroom 52 sf, total 207 sf)
Installation of heavy duty sidewalk shed with material storage (300 psf and 600 psf) during facade repair. no change in egress, use, or occupancy. shed to comply with 2014 nyc building code.
Facade repairs as per plans submitted herewith. there is no change in use, egress or occupancy.