Search Building Permits
2,108 permits · Demolition
Full Demolition - complete demolition to create vacant lot
unit #4: demolish (e) bathroom, walls and floor to beams. remove part of (e) wall between bathroom and closet. move toilet and sink, build new wall for shower. lower ceiling by 5 inches including show...
Limited demolition of the 663 space for future Ferragamo Flagship, including Floors 1-3, Structural filing for slab infills, & new non-load bearing party wall separating building no. 663 from 655 5th...
Mechanical means submitted for use of mechanical equipment and use of chute at the time of demolition in conjunction with the demo application
Full demolition on existing 1-story detached garage in rear yard.
Debris chute will be installed/built to lower debris from floor to floor. Mechanical means will assist with demolition from exterior and placed on grade.
Full demolition to an eight story building
Full mechanical demolition of existing 1 story residential house
Partially demolish existing mechanical systems, ductwork, piping, equipment, etc. furnish and install new mechanical piping and valves, accessories, etc. provide all mechanical services, materials, et...
Demolition and general construction work on 16th floor as per plans. No change to use. egress or occupancy.
Full demolition one (1) story garage.
Minor interior renovation in apartment 11F on the 11th Floor. Work includes non-structural demolition, general construction and new exhaust as per plans file herewith. No change to use, egress or occu...
Fully demolition of existing one story house
Exterior: new storefront windows in existing openings. removal of existing canopy and addition of exterior signage.interior: tenant build out for a new fine/fast-casual restaurant with dine-in and tak...
Pre-tenant work 27-29-- interior demolition and construction required for bathroom fitout as per plans filed herewith. no change to use, egress, or occupancy.
Interior demolition and renovation of firstlevel. only as indicated on the drawings and replace existing rear deck
Proposed temporary construction fence for the demolition of the existing building and the construction of the new detached one family residence.
Phase 2 demolition of interior finishes/partitions within an unoccupied college dormitory. Related work filed under ST# M01310628 and ALT CO #M01264739 as part of NYC DOB MPP Program. No change in use...
Fully demolition of existing 2 1/2 story house
Fully demolition of existing two story house.