242 S 20th St
Philadelphia · PA · 19103
Philadelphia · PA · 19103
Addition and/or alteration - for level i alterations to an existing structure. alterations to include the replacement of existing windows. all work to be done per approved plans. if field conditions vary contact design engineer prior to the start of any work. separate permits to be obtained for all other work. asbestos abatement required before the start of work.
New construction - for the construction of a four (4) story attached structure to be used as multi-family (fourty-six (46) dwelling units) household living and fourteen (14) off-st…
Addition and/or alteration - for alterations including roof framing modifications to an existing single-family structure as per approved plan. *separate permits required for electr…