Scope of Work: - Foundation - Excavation, Footing, Blockwork - Demo - As Needed / Plan - Frame - New Addition - Existing House Modifications / Plan - Windows - Install New or Repurposed (LABOR ONLY) - Exterior Trim - Fascia (metal to match existing) / Soffit (to match existing) - Brickwork - Integrate new brick with existing, matching as closely as possible - Siding - Exterior siding above brickline, both ends of house - Shingles - New shingle roof, existing tear off & replace and new construction areas (whole house) - Provide - All Material & Labor for Work Described Above (unless otherwise noted) - Dumpster(s) - [as needed per this scope] - Maintain Clean & Safe Jobsite. average front setback is 30' per plat, maximum lot coverage is 1435SF with a total lot coverage of 1352SF. maximum height is 16' and stories, this work will not raise the roof of the home. home will be 3 bedroom and 2 bathrooms.